ReviewEssays.com - Term Papers, Book Reports, Research Papers and College Essays
Search

Er.

Essay by   •  December 3, 2010  •  Study Guide  •  616 Words (3 Pages)  •  1,052 Views

Essay Preview: Er.

Report this essay
Page 1 of 3

RESUME

C/o:- Md.Rizvi Ahsan

3rd floor, 139/2

Street No-7, Ramesh Park,

Laxmi Nagar,

New Delhi- 110 092

MD.KHALID AHMAD

B. E (ELECTRONICS & TELECOM.)

E-mail: khalid4083@yahoo.co.in

Mobile: 9891413160

Objective:

Quest to work in real professional atmosphere that enable me to cope up with the emerging as well as the latest technology and scope for widening the spectrum of my knowledge.

PROJECTS:

Project Name : Intelligent P.C.B Drilling Machine.

Duration : 12 Months

Purpose : Final year Project

Team Size : Three

Environment : Microcontroller based system interfacing with memory.

Description : The objective of our project is to implement a PCB

drilling machine of low cost & optimum components. Which may helpful for the small-scale Electronics industries around the country.

To achieve this, complete design and drawing of different parts have been made under guidance of project guide.

Project Name : Auto Tracking Robot “Spirit”.

Duration : 15 days.

Purpose : Participating in Robotics competition.

Team Size : Four

Environment : Microcontroller based system.

Description : The objective of our project is to implement a Robot

which has to follow the curved path.

Achievements:

1. Won Ist prize in mindbend2004 Robotics competition at SVNIT, Surat.

2. Represented college in Robotics exhibition cum competition Robodeas at Pune.

3. Nominated for Emerging Wirless Technology Award 2005 and stood under Top-7 at IIIT,Pune. Paper published in proceeding of IIIT.

Presentation:

Topic Competition Level Place

Preventing Mobile Hacking National International Institute of Information Technology (IIIT), Pune

SMS Spoofing National S. V. Memorial Engineering College, Nashik, Maharashtra

Fuzzy Logic Controller National S. V. Memorial Engineering College, Nashik, Maharashtra

Industrial Training : Completed 18 days training in Reliance Telecom

Limited, Patna, from May 30, 2003 to June 16, 2003.

and installed Pro-com. in switching office(MSC).

Industrial visit : Visited Himachal Pradesh in Jan2005 arranged by the

college and came in touch with companies like HFCL,

HECL and Samtel.

Final year seminar : Mobile Hacking & its Prevention.

...

...

Download as:   txt (3.9 Kb)   pdf (80 Kb)   docx (11.1 Kb)  
Continue for 2 more pages »
Only available on ReviewEssays.com