Green Building & Sustainability Practices
Essay by Mukund Agarwal • August 23, 2018 • Creative Writing • 673 Words (3 Pages) • 945 Views
Group 5
Ashwin Likhar PGP18106 | Mukund Agarwal PGP18127 | Sai Bhargavi Vedula FPM1810 Indravadan Addanki PGP18124 | Nidheesh S Kumar PGP18128 | Hiremath Gireejatmaj Chandrakant PGP 18123 | Ashish Haldia PGP18104 | Amrut Hutagikar PGP18270 |
Goal: Green Building & sustainability practices
Relevant Content
- Siting and structure design efficiency
- Materials efficiency
- Operations and maintenance optimization
- Reduce impact onto electricity network
- Awareness in general to have sustainable lifestyle
Government sets up a Committee comprising key stakeholders – ICC, BCCI, and Environment, Power & Housing and Development Ministry. This committee is further mandated to appoint committees for Action Plan Phase 1 – 5 and shall be reporting to appointing authority.
Action Plan Phase 1- Siting and structure design efficiency
Modification in existing infrastructure | New Infrastructure | |
1. | Committee to submit report on viability of modifying existing infrastructure to meet minimum LEED green building ratings | Roll out tender to invite bids from Architects |
2. | Roll out tender to invite bids from Architects | Committee to assess the bids based on LEED green building ratings |
3. | Committee to award project to suitable bidder | Assess total environmental impact associated with all life cycle stages of project and award the project to suitable bidder |
Action Plan Phase 2: Materials efficiency
Modification in existing infrastructure | New Infrastructure | |
1. | Committee to do a rigorous background check of suppliers shortlisted by bid winner architect in Phase 1 | Committee to do a rigorous background check of suppliers shortlisted by bid winner architect in Phase 1 |
2. | Prioritising recycled products, or products that can be less damaging to environment like
| Prioritising recycled products, or products that can be less damaging to environment like
|
3. | Assess products being procured for quality and authenticity | Send raw materials samples used in the construction phase for testing |
4. | Conduct surprise checks during fitment of supplies | Conduct surprise checks during construction and during fitment of supplies |
Action Plan Phase 3: Operations and maintenance optimization
|
|
|
|
|
Action Plan Phase 4: Reduce impact onto electricity network
Modification in existing infrastructure | New Infrastructure | |
1. | Committee to lay down policy in tender document on use of renewable and non-renewable sources of energy | Committee to lay down policy in tender document on use of renewable and non-renewable sources of energy |
2. | Approval to designs be granted only if designs are best suited to utilise natural resources such as sunlight, wind flow direction | |
3. | Approval to new electric equipment to be granted based on energy efficiency parameters – Star Rating 4/5 | Approval to new electric equipment to be granted based on energy efficiency parameters – Star Rating 4/5 |
3. | Committee to further lay down extensive policy guidelines for electricity use optimization | Committee to further lay down policy guidelines for electricity use optimization |
...
...