Risk Management for M & A
Essay by Souvik Roy • August 21, 2016 • Study Guide • 2,345 Words (10 Pages) • 1,104 Views
Scholastic
98% percent in mathematics
96% in PCM
work ex(roles and achievements)
#project value is 90 lakhs
#Six Sigma Green Belt
#Procurement related
Vendor Management – Follow-up on procurement and vendor quality assessment
Member, Core team of 6, responsible for a major successful gas turbine overhaul operation
Led a team of 6 professionals for managing timely completion of Turbine Overhauling project
Core Team Member – commissioning of India’s 2nd Supercritical Power Plant MGTPP in Haryana
Member of Cross Functional Team for implementation of Safety, Health and Environment regulations
Conceptualized a ready-reckoner in absence of standardized manuals on Wagon Tippler Hydraulics
Built and Implemented Risk Assessment Techniques using FMEA for plant-wide safety
Designed new visual methods of Tool Box Talks to communicate safety measures to workers
Designed time-tracking sheet to get objective evaluation of progress of overhaul
Data analysis from Request for Quotations, generic cost-sheets, conversion costs & packaging charges
Cost-Benefit Analysis of the re-engineered costing process yielded increased profits of Rs 24 Lakhs / Year
10% Cycle-Time Reduction through streamlining the processes using Yamasaki charts
Performed Value Stream Mapping and diagnosed the bottlenecks in the existing process
Mentored a team of 30 workers about the process and designed a proper flow of material in the scrap shop
Awarded Letter of Appreciation for exemplary performance during the training
Identified and Negotiated with Logistics providers and vendors for optimal inventory management
15% Cost Reduction through the streamlining of the packaging process
Analyzed the RFQ process and coordinated with the Client SME to understand business requirement
SPOC for resolving critical issues and conducting root cause analysis
Recognized as the Star Performer of the Month, a prestigious award for excellent performance
Performed “Value Stream Mapping” to eliminate the non value adding steps
Internal PPM reduction using six sigma (DMAIC) methodology
Optimized the inventory levels and established one piece flow wherever possible
Single point of contact, responsible for the quality assurance of alimony calculation module
Performed feasibility analysis & defined Project Scope, mapping client requirements with technical capability
Coordinated with Development team to ensure conformity of design document with Project Scope
Liaised between client and functional and development teams for technical & functional clarifications
Designed Key Performance Indicator dashboard to monitor project progress and control quality
Coordinated defect management activities by delegating defects to respective development and testing teams
Prepared Root Cause Analysis of Production Defects
Estimated Effort for Change Requests during the project
Coordinated and Participated in Cross Functional training sessions for Knowledge sharing every fortnight
Received Star of the Quarter award among a group of 30 on the successful completion of $80 million project
Achieved potential savings of £0.5 million by effecting process re-engineering through automation
Top Performer in the initial learning program among a group of 120 students
Selected as one among 25 for Campus Connect Program by Infosys out of 500 students
Analyzed and delegated functional requirements to the design and development team
Key Member of the team which implemented Lead Management Framework functionality
Selected in 30 member batch of Star Program at Wipro – a fast track management program for IITs
Chosen to present monthly sales dashboards to Vice President, Retail and heads of account teams
Estimated quantity requirements of safety equipment in the plant for material requisition
Single point of contact between consultants and clients in arbitrating design & schedule concerns
Coordinated between different departments to address issues in the plant layout
Conducted Market research & Data Analysis for Channel Development using excel, dashboards, surveys
End to end implementation and training of Sales Force CRM at organization level
Collaborated with cross functional teams across multiple geographies for smooth business functioning
Managed Knowledge and Document Repository
Performed Design of Experiments using MiniTab® and identified the Influential process parameter
Oversaw the procurement of roll cage material and Spearheaded the negotiations with the supplier
Undertook the profiling and supervised welding of the roll cage in conformance with design parameters
Involved in fabrication and installation of the power train
Observed clutch, gearbox and engine overhaul, assembly and installation
Prepared Bill of Materials (BOM) and engineering plan for material forecasting and cost reduction
Handled purchasing and indenting for Bought out Items worth INR 15 Million
Prepared purchase qualification requirements to generate RFQs for condenser and heat exchanger items
Responsible for vendor selection, evaluation and registration, category management for bought-out items
Evaluated Quotations from various vendors/sub contractors for technical suitability
Facilitated execution of subcontracting orders by defining key deliverables and scope
Spearheaded Tendering and cost estimation for Power projects and prepared technical bids
Member of Root cause analysis team for problem identification and resolution by CAPA Methodology
SPOC between BHEL and client for projects worth INR 500 Million
Member of Audit team to conduct Quality Audits of various vendors and sub-contractors
Reversed engineered and indigenized support bearings for in-house manufacturing leading to recurring saving of INR 50 Million
Conceptualization & Designing end-to-end process of fabricating of hydraulic gates
Monitoring project activities & coordinating with Vendors & Contractors to meet the targets
Material Procurement of capital equipment through RFQ & Technical Bid Evaluation
Commissioning & Quality Inspections of construction equipment during installation at project site
...
...